Project Geothermal Power Plants

This project required careful planning and layout including forming and pouring 176 individual footings for the equipment of the power plant with tolerances as tight as 1/8th of an inch. The project required a construction pad for the work area which included moving 50,000 cubic yards of material, some of which had to be blasted to be removed.